Turn Key Air Conditioning Ltd – Air Conditioning Contractors

TKAC

Turn Key Air Conditioning Design, Supply, Installation and Maintenance


TKAC

TKAC in Partnership with Mitsubishi

Turn Key Air Conditioning – Crowne Plaza Hotel, Buckinghamshire

Woolley Wood School

Turn Key Air Conditioning have a long history of working in partnership with some of the most notable names in the UK. We design, install and maintain air conditioning & heat recovery systems for high street chains, schools & colleges, local retailers, business parks, medical centres and office developments.

Not surprisingly our experience and expertise makes us the perfect choice for the design and installation of air conditioning & heating systems in the hotel sector. Over recent years TKAC have been appointed time after time by some of the UK’s best known hotel groups to create energy efficient heating & air conditioning systems that meet the highest expectations of their guests.

TKAC – Working in Partnership

In any new build or refurbishment project Turn Key Air Conditioning is an essential wheel in a larger machine. While air conditioning & heating systems are designed to meet the long term requirements of the client – minimising energy costs while providing clean, fresh air at controllable temperatures – the installation phase has to be handled sensitively. Turn Key AC take great care to cause minimum disruption to the day to day operations of our clients and wherever possible manufacturing is carried out off-site. We also coordinate all on-site installation work with other contractors.

But it is not just on the construction site where TKAC work in partnership. Turn Key AC have developed lasting and effective partnerships with all the major names in HVAC manufacturing, including technology giants Mitsubishi Electrics. For the Crowne Plaza Hotel, TKAC opted for a Mitsubishi Electric Multi Heat Recovery System.

Innovations in Heat Recovery Systems

Woolley Wood School

The Crowne Plaza Hotel in Gerrards Cross, Buckinghamshire is a 147 bedroom hotel and conference centre. It was recently bought by the Cairn Hotel Group and has undergone a total refurbishment. TKAC has an ongoing relationship with the Cairn Group – as consultants and as air conditioning maintenance engineers - and worked with them on the Crown Plaza project from day one to design a system that meets all the requirements of guest comfort, energy and legislation.

One of the challenges in the Crowne Plaza Hotel was that each room is distinctive but to TKAC every challenge offers an opportunity. In this case the opportunity was to use Mitsubishi City Multi System where the unique two pipe heat recovery system provides much more flexibility in design and installation. More than this, the combination of inspired design and innovative product meant that we were able to design out the need for leak detection.

Energy Efficient Design Solutions

Current legislation – EN378 in particular – restricts the use of refrigerants to minimise potential hazards to people, property and the environment. TKAC worked closely with Mitsubishi Electric Value Added Reseller (VAR) PACAIR to design the system to minimise the amount of refrigerant in each bedroom to comply with EN378.

Working with PACAIR also saw Turn Key install Mitsubishi’s Melcotel TM hotel control system which links every individual room to the Ving cards to stop the system from operating when the room is unoccupied. Melcotel gives a significant energy cost saving to the hotel with no loss of comfort for customers.

TKAC Design & Installation

Woolley Wood School

One of the many benefits of the TKAC design of the air conditioning & heat recovery system for the Crowne Plaza Hotel was that installation could be carried out in 5 phases to fit in with the requirements of the whole refurbishment project.

Turn Key AC fitted the infrastructure to the ground floor before installing ducted fancoil units in the hotel bedrooms. Mitsubishi City Multi ceiling cassettes were installed in all public areas and Lossnay ventilation and heat recovery units were used to maximise the flow of fresh air into the building.

Turn Key Air Conditioning – Next Steps

The fully refurbished Crown Plaza Hotel at Gerrards Cross is on target to be completed in 2015. Turn Key AC are already working with the Cairn Hotels on the implementation of leak detection free, heat recovery systems in other hotels in the group.

Every new heating, ventilation and air conditioning (HVAC) project carried out by Turn Key AC brings further innovations in design and installation.

Air Conditioning Projects, Crowne Plaza Hotel, Cairn Hotel Group, Mitsubishi City Multy Heat Recovery System, Melcotel, Heating, Heat Exchange Technology, Project Management Engineers, Design, Off-Site Manufacture, Installation, Servicing & Maintenance, Mitsubishi Electric Business Partners, Ventilation, HVAC, Ecodan Air Source Heat Pumps, Energy Efficient Climate Control for Hotels, Schools and Retail, EN378. Installations in Leeds, Birmingham, London

Air Conditioning Project Management & Engineering Management. Nationwide Air Conditioning Installation, Service & Maintenance. Accredited Air Conditioning Contractor Safecontractor Scheme. Air Conditioning Installations, Service & Maintenance in London, Manchester, Leeds, Sheffield, Newcastle, Sunderland, Bradford, Glasgow, Edinburgh, Aberdeen, Leicester, Bristol, Swansea, Cardiff, Coventry, York, Nottingham, Derby, Northampton.

Air Conditioning Installation & Maintenance Contractors - Newcastle, Tyneside, Sunderland, Teesside, Sheffield, Birmingham, Nottingham, Leeds & London.